Goethals Bridge Replacement – PANYNJ Contract No. UPTBT13026 (Crisdel Group Inc.)

Project Overview :

This replacement bridge will be located south of the existing bridge. Project will consist of three 12-foot wide lanes in each direction, sidewalk and bikeway, with a 138 foot clearance permitting passage of ships.

The contract will also include demolition of the existing bridge upon completion. Working with Crisdel Group Inc., in turn working for Kiewit-Weeks-Massman, AJV (KWM) Owner, Garden State is providing the survey control, layout and as-builts.

Service:Survey

Sector: Bridge/ Tunnel