Park Avenue Over Route 3

Project Overview :

The existing three (3) span bridge was replaced with a 140-foot single span bridge over Route 3. The new Park Avenue structure now carries two-lane traffic in each direction. The project included drainage improvements, roadway resurfacing, sidewalk installation, and curb installation on the Park Avenue approaches to the new bridge.

Teaming with Anselmi&DeCicco, Inc., Garden State performed value engineering design that included vertical profile adjustment, regrading and steel plate girders redesign. Garden State also provided construction support services that included demolition calculations and drawings. Surveying services included survey control, construction layout and field stakeout for the new bridge structures and surrounding roadway and drainage work.

Service: Structural Engineering, Surveying, Civil Engineering

Sector: Bridges/Tunnels, Construction Services, Transportation