Saint. George Ferry Terminal

Project Overview :

This $175M rehabilitation includes deck replacement of car and bus ramps, repair and replacement of structural steel and concrete substructure, demolition and reconstruction of a new vehicle ramp and a public stairway.

Garden State Engineers designed formwork, guardrails, work platforms, shielding below decks and around utilities, and track protection. Analyses incorporated as-built drawings beginning in 1946 through reconstruction to date, combined with current construction documents.

Service: Structural Engineering

Sector: Marine/Water/Waste